Individual skill

pm-gtm-plan

Build a go-to-market plan that's a stage-appropriate system — customers, channels, pricing, timing, and partnerships that fit the company's maturity — not a generic launch checklist. Gates on GTM readiness (validated demand) and company stage, picks the right channel and entry timing, and treats the buyer journey as non-linear. Catches the defaults Claude misses: GTM-as-one-time-launch, stage-skipping, channel/timing blindness, funnel-forcing, partnerships-as-shortcut. Trigger when asked to create a GTM/go-to-market plan, launch plan, channel or distribution strategy, market-entry/timing plan, or launch metrics.

pm/deliverables/gtm-plan/SKILL.md

Read pinned source

Source commit 5007cd0241ccaa51ae2e4681f9618912dc10e239

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 6, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
40
Repository last updated
Jul 2, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Go-to-Market Plan Skill

## How this skill behaves (read first)

This is a **generative** deliverable skill, and "write a GTM plan" is where an AI assistant defaults to a **generic launch checklist** — announce, blog post, social, email, press — with no strategy underneath. The deeper mistakes: treating GTM as a **one-time launch** rather than a living system, **stage-skipping** (bolting a reseller network or paid-acquisition engine onto a company with 8 customers), ignoring **timing** (seasonality, B2B budget cycles, market readiness), and **funnel-forcing** buyers through a pipeline on the company's schedule. A GTM plan that doesn't fit the company's stage burns the resources that should be going to the actual foundational work.

So this skill gates hard:

1. **Establish context** — GTM readiness (is demand validated?), company maturity stage, customer/business-model type, and timing conditions.
2. **Apply the always-true core** — GTM as a system of five interlocking components, stage-appropriate execution, channel-as-cost-structure, timing awareness, non-linear buyer journey.
3. **Surface the context-dependent decisions** (stage tactics, channel model, business-model motion, entry timing, partnerships) with trade-offs; let the user choose.

Then it **hands off to `pm-okr-metric-validity-audit`** (are the launch metrics valid, not vanity?) and **`pm-assumption-rigor-audit`** (is demand really validated, is the timing window real, will the channel actually work?).
Back to top