estimate
Estimate how many points and how many hours a task, a feature, or a screen takes: size each item with a stated basis, mark the confidence, and add the risk buffer as a visible line, so the numbers can be argued with in planning. Use for story points, hour or man-day estimates, and re-estimation after scope change. Triggers on: "estimate", "estimation", "story point", "man-day", "how long will this take", "ước lượng", "bao nhiêu point", "mất bao lâu", "見積", "工数", "何時間かかる", "/atk:estimate".
plugins/atk/skills/estimate/SKILL.md
Source commit 55481d2e4ae3cec8e2050c160303c751bbf20173
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Not checked yet
- Last checked
- Nov 6, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 12
- Repository last updated
- Nov 9, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- agent-skills Repository topic
- ai-skills Repository topic
- claude-code Repository topic
- codex Repository topic
- cursor Repository topic
- plugin Repository topic
- sdlc Repository topic
- team-workflow Repository topic
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 12,479 bytesSKILL.mdcore · 12,479 bytesSKILL.mdcore · 12,479 bytesevals/trigger_evals.jsonasset · 1,709 bytesreferences/comparables-pool.mddoc · 16,837 bytesreferences/complexity-drivers.mddoc · 4,021 bytesreferences/estimate-template.mddoc · 13,342 bytes
Read excerpt
# Estimation (`atk:estimate`)
Produces an estimate whose numbers can be argued with, because every number carries the basis it
came from: a comparable past item, a decomposition, or a stated unknown. It answers how much each
item costs, in points and in hours; which items go into a sprint is the PM's call in sprint
planning, made from these numbers and the team's resources.
## Scope
Handles: sizing backlog items, recording the estimation basis and confidence, adding a risk buffer,
and flagging items too large or too vague to estimate.
Does NOT handle: writing the requirement (`atk:intake`), splitting work into tasks
(`atk:breakdown`), or the team's capacity and the sprint commitment, which the PM works out in