Estimate how many points and how many hours a task, a feature, or a screen takes: size each item with a stated basis, mark the confidence, and add the risk buffer as a visible line, so the numbers can be argued with in planning. Use for story points, hour or man-day estimates, and re-estimation after scope change. Triggers on: "estimate", "estimation", "story point", "man-day", "how long will this take", "ước lượng", "bao nhiêu point", "mất bao lâu", "見積", "工数", "何時間かかる", "/atk:estimate".

plugins/atk/skills/estimate/SKILL.md

Read pinned source

Source commit 55481d2e4ae3cec8e2050c160303c751bbf20173

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
No
Observed behavior
Not checked yet
Last checked
Nov 6, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
12
Repository last updated
Nov 9, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Estimation (`atk:estimate`)

Produces an estimate whose numbers can be argued with, because every number carries the basis it
came from: a comparable past item, a decomposition, or a stated unknown. It answers how much each
item costs, in points and in hours; which items go into a sprint is the PM's call in sprint
planning, made from these numbers and the team's resources.

## Scope

Handles: sizing backlog items, recording the estimation basis and confidence, adding a risk buffer,
and flagging items too large or too vague to estimate.

Does NOT handle: writing the requirement (`atk:intake`), splitting work into tasks
(`atk:breakdown`), or the team's capacity and the sprint commitment, which the PM works out in