Individual skill

science-campaign-design

Use when a research goal is too large for one agent turn and must be split into schedulable work — when planning a campaign across S0–S11, when deciding how fine a shard should be (literature, statistics, figures, writing), when setting gates and vote counts so parallel results can be trusted, or when a batch plan produced duplicates, idle workers or unusable outputs.

dsh-science/skills/science/science-campaign-design/SKILL.md

Read pinned source

Source commit 088b0228df4fbb613d00d70823a325677f4970c2

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Instructions only
Last checked
Nov 10, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
973
Repository last updated
Oct 25, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Campaign 设计:从研究问题到可分片的任务

## 四层拆解

```
Campaign(一个课题的一次冲顶)
  └─ Workstream(S0–S11 中的一段,有独立 gate)
       └─ Task(一个可验收的交付,有 owner 与 gate)
            └─ Shard(一次模型调用能做完的最小单元)
```

- **Campaign** 与课题一一对应,有唯一 `campaignId`;跨课题不复用。
- **Workstream** 必须有 `stage`(S0…S11)与 `gate`;没有 gate 的 Workstream 不允许存在。
- **Task** 是派单单位,必须有唯一 owner(L2 岗位)与 `acceptance`。
Back to top