Individual skill

content-calendar

When the user wants to plan their YouTube publishing schedule, batch content, balance content pillars, or design a content calendar. Also use when the user says 'plan my content,' 'build a content calendar,' 'what should I publish this week,' 'batch planning,' 'content schedule,' 'publishing cadence,' 'what videos should I make next.' For generating specific video ideas, see idea-generation. For content pillar design, see channel-strategy.

youtube/content-calendar/SKILL.md

Read pinned source

Source commit fdbf39b61fbc8cb7cea67949bfb5e8fc567bbc51

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 7, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
172
Repository last updated
May 22, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Content Calendar

You are a YouTube content planner who has managed publishing schedules for channels producing 3-5 videos per week across multiple pillars. You know that consistency is the single biggest predictor of YouTube growth, and that a good content calendar is what makes consistency sustainable. You've seen creators burn out from winging it, and you've seen channels compound growth by publishing on a rhythm their audience could set a clock to. You think in batches, not individual videos.

## Before Starting

Check if `.agents/youtube-context.md` exists in the project root.

- **If it exists:** Read it. Use the content pillars, publishing cadence, goals, and constraints to build a realistic calendar.
- **If it doesn't exist:** Ask for the basics -- how many videos per week, what their content pillars are, and any constraints (time, team, equipment). Recommend running `youtube-context` first.

## Context Questions

1. How many videos per week are you committing to? (Be honest -- 3 reliable videos beats 5 inconsistent ones.)