Individual skill
month-end-close
Guides finance teams through a controlled month-end close - sub-ledger cutoffs, journal entries in dependency order, full balance-sheet reconciliation, flux analysis, and sign-off - targeting a locked close by business day 5-10. Use when someone asks "help me close the books", "build a close checklist", "our close takes three weeks, how do we shorten it", "what order do the journal entries go in", or is preparing for an audit. Do NOT use for constructing or interpreting the financial statements themselves - use financial-statement-builder instead - or for writing the budget-variance narrative that follows the close - use budget-vs-actual instead.
skills/month-end-close/SKILL.md
Source commit 97a13607d669157a4a16d5ba79b77f208319f7b9
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Not checked yet
- Last checked
- Nov 6, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 24
- Repository last updated
- Oct 13, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Read excerpt
# Month-End Close
A fast, clean close is the result of consistent preparation, not heroics at deadline. The failure this skill prevents is the restatement: a late invoice posted after reconciliation, an unreconciled variance carried forward "to fix next month," a flux swing nobody explained that turns out to be a misposted entry. The sequence below has hard checkpoints so nothing slips and the books reflect economic reality.
Target: sign-off and lock by business day 5 for a well-run close; day 10 is the outer acceptable bound. A close consistently past day 10 means the pre-close phase is being skipped - fix the calendar, not the deadline.
## Operating procedure
The order is dependency order, and it is not negotiable: journals before sub-ledger lock, lock before reconciliation, reconciliation before flux, flux before sign-off. Reconciling before the lock guarantees rework; running flux before reconciliation means explaining errors instead of catching them.
### Step 1: Gather inputs (once, when adopting this process)
1. Chart of accounts and entity structure (any intercompany?).
2. Sub-ledger systems for AP, AR, payroll, inventory, and who owns each cutoff.