Individual skill

mutual-action-plan

Builds a mutual action plan (MAP) with shared milestones, named owners, and buffer-padded dates that drives a qualified deal from verbal intent to signature and go-live. Use when someone asks "build a mutual action plan for this deal", "how do I keep this deal from stalling", "the buyer said yes but nothing is moving", or once a prospect is qualified and has expressed intent to move forward. Do NOT use for preparing the qualification call itself - use discovery-call-prep instead. Do NOT use for scripting the negotiation and close conversation - use closer-sales-script instead.

skills/mutual-action-plan/SKILL.md

Read pinned source

Source commit 97a13607d669157a4a16d5ba79b77f208319f7b9

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 6, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
24
Repository last updated
Oct 13, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Mutual Action Plan

A mutual action plan is a shared document that aligns buyer and seller on every step between "we want to move forward" and "the contract is signed and live." The word mutual matters: if the buyer has not contributed to and agreed on the plan, it is a vendor's wishlist, and the deal it was supposed to protect will stall in legal, procurement, or a budget cycle nobody mentioned. The costly mistake this skill prevents is discovering a six-week security review three weeks before the quarter ends.

## Operating procedure

Steps run in this order because dates cannot be set before milestones are known, and milestones cannot be known before the buyer has contributed theirs.

### Step 1: Gather inputs

Collect before drafting anything. Label guesses as guesses.

1. Deal stage and evidence of intent - a MAP before clear evaluation intent is premature. Default assumption: qualified with verbal intent.
2. Buyer's desired go-live date, or the business event driving urgency. If neither exists, that absence is a finding (see Step 3).