Individual skill
mutual-action-plan
Builds a mutual action plan (MAP) with shared milestones, named owners, and buffer-padded dates that drives a qualified deal from verbal intent to signature and go-live. Use when someone asks "build a mutual action plan for this deal", "how do I keep this deal from stalling", "the buyer said yes but nothing is moving", or once a prospect is qualified and has expressed intent to move forward. Do NOT use for preparing the qualification call itself - use discovery-call-prep instead. Do NOT use for scripting the negotiation and close conversation - use closer-sales-script instead.
skills/mutual-action-plan/SKILL.md
Source commit 97a13607d669157a4a16d5ba79b77f208319f7b9
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- Yes
- Observed behavior
- Not checked yet
- Last checked
- Nov 6, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 24
- Repository last updated
- Oct 13, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- claude Repository topic
- claude-skills Repository topic
- skill-me Repository topic
- sales Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 8,321 bytes
Read excerpt
# Mutual Action Plan
A mutual action plan is a shared document that aligns buyer and seller on every step between "we want to move forward" and "the contract is signed and live." The word mutual matters: if the buyer has not contributed to and agreed on the plan, it is a vendor's wishlist, and the deal it was supposed to protect will stall in legal, procurement, or a budget cycle nobody mentioned. The costly mistake this skill prevents is discovering a six-week security review three weeks before the quarter ends.
## Operating procedure
Steps run in this order because dates cannot be set before milestones are known, and milestones cannot be known before the buyer has contributed theirs.
### Step 1: Gather inputs
Collect before drafting anything. Label guesses as guesses.
1. Deal stage and evidence of intent - a MAP before clear evaluation intent is premature. Default assumption: qualified with verbal intent.
2. Buyer's desired go-live date, or the business event driving urgency. If neither exists, that absence is a finding (see Step 3).