cost-projection

Forward-looking spend extrapolation. Computes a USD-per-day rate from the recent measurement window, projects to 7d/30d/90d/365d horizons, and surfaces "days until budget exhausted" when a budget is configured. Predictive counterpart to `cost-budget-check` (reactive).

plugins/ruflo-cost-tracker/skills/cost-projection/SKILL.md

Read pinned source

Source commit 722232566ad1fc4e73ba4fefc46d77d380ce61ba

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 6, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
81,279
Repository last updated
Nov 7, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

Forward-looking cost projection that pairs with `cost-budget-check`:

- **`cost-budget-check`** answers "have we crossed the line?" — reactive
- **`cost-projection`** answers "when will we cross the line?" — predictive

## Algorithm

1. Read all `session-*` records from the `cost-tracking` namespace (same source `cost-budget-check` uses).
2. Filter to a measurement window (default last 7 days on `capturedAt`/`startedAt`).
3. Compute the per-day burn rate: `windowSpend / windowDays`.
4. Linear-extrapolate to each requested horizon (default 7d/30d/90d/365d).
5. If a budget is configured (`budget-config` key set by `cost-budget set`):
   - Compute "days until 75% / 90% / 100% consumed" at the current rate.
   - Surface as a separate table block with `ALREADY REACHED` markers for thresholds already exceeded.