Individual skill
story-point-estimator
유저스토리의 스토리 포인트를 체계적으로 추정하는 방법론. '스토리 포인트 추정', 'SP 산정', '공수 추정', '벨로시티 계산', '플래닝 포커' 등 스프린트 계획 시 사용한다. 단, 실제 Jira 티켓 업데이트, 팀 미팅 진행은 이 스킬의 범위가 아니다.
ko/46-product-manager/.claude/skills/story-point-estimator/skill.md
Source commit 8e8d35c6a19166614d1af1df85512266d51121ae
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- Yes
- Repository scan complete
- No
- Skill scan complete
- Yes
- Observed behavior
- Instructions only
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,324
- Repository last updated
- Mar 22, 2026
- License
- Apache-2.0
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
skill.mdcore · 4,595 bytes
Read excerpt
# Story Point Estimator — 스토리 포인트 추정 방법론
sprint-planner와 story-writer의 공수 추정 역량을 강화하는 스킬.
## 대상 에이전트
- **sprint-planner** — 스프린트 용량과 스토리 배분을 계획한다
- **story-writer** — 유저스토리 작성 시 복잡도를 평가한다
## 피보나치 스케일 기준표
| SP | 복잡도 | 불확실성 | 노력 | 기준 예시 |
|----|--------|---------|------|----------|
| 1 | 매우 낮음 | 없음 | 수시간 | 텍스트 변경, 설정값 수정 |