Individual skill

release-day-countdown

Plan an independent music release backwards from release day — the 8-week countdown with distributor upload deadlines flagged, playlist pitch windows, the pre-save decision made honestly, content batched before the chaos, and a release week that doesn't depend on luck. Use when a musician says 'I'm releasing a single/EP', 'when should I submit to playlists', 'plan my release', or uploaded to a distributor with no plan. Produces the week-by-week countdown, the asset checklist, and release-week runbook.

skills/release-day-countdown/SKILL.md

Read pinned source

Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,540
Repository last updated
Nov 10, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Release Day Countdown Skill

Most independent releases happen twice: the day the song goes live to 40
streams, and the month later when the artist learns what they should have
done eight weeks early. The machinery has real deadlines — distributors
need lead time, editorial playlist pitching closes *before* release day,
content is impossible to batch once the week arrives — and none of it is
complicated; it's just sequenced. This skill runs the sequence backwards
from the date (or forwards to pick a date honestly), with every
platform-specific number flagged as check-current, because lead times and
pitch windows change and a plan built on stale specifics is a plan built
on sand.

## What This Skill Produces
Back to top