Individual skill
schedule-monte-carlo
Project completion as a distribution, not a date — Monte Carlo over the task graph. Use when a plan's finish date came from summing 'likely' estimates (it's wrong, mathematically), when leadership needs a commit date, or when you need to know which tasks actually control the timeline. Produces P10/P50/P90 completion, per-task criticality (how often each task sits on the critical path), and a real .xlsx — via the bundled zero-dependency simulator, deterministic with a seed.
skills/schedule-monte-carlo/SKILL.md
Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- Yes
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Network or broad shell
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,539
- Repository last updated
- Nov 10, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- product-management Repository topic
- productivity Repository topic
- skills Repository topic
- claude-skills Repository topic
- agent-skills Repository topic
- chatgpt Repository topic
- claude-code Repository topic
- cursor Repository topic
- gemini Repository topic
- prompt-engineering Repository topic
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 3,721 bytesSKILL.mdcore · 3,721 bytesscripts/schedule_sim.pyruns · 8,255 bytes
Read excerpt
# Schedule Monte Carlo
Summing the "likely" estimates systematically understates the finish: parallel branches mean the *slowest* path wins each roll, and that maximum is always worse than the middle. This skill runs the actual simulation — thousands of schedule rolls over the dependency graph — and reports the date the way it behaves: as percentiles.
## Required Inputs
- **The task list with three-point estimates** — per task: optimistic / likely / pessimistic (any consistent unit) and dependencies. Honest pessimistics are the whole game: "what if the API vendor ghosts us for two weeks" belongs in that number.
- Simulation count and seed (optional; defaults 5,000 and a fixed seed — results are reproducible).
## Output Format
1. **The headline gap** — deterministic finish (sum-of-likelies) vs P50 vs P90, side by side. The deterministic-to-P50 gap is the lie the old plan told; show it first.
2. **The commitment guidance** — promise P50 internally, P90 externally; the space between is the honesty budget. Name the dates.
3. **Criticality table** — per task, the share of simulations where it sat on the critical path. The top 2-3 are where management attention belongs; a task at 0.9 criticality with a wide estimate range is the schedule.