Individual skill
freight-rate-quote
Build a freight rate that covers the cost of actually running the load — the per-mile economics, the deadhead and detention nobody prices, and the accessorials that decide whether the lane is profitable. Use when asked to quote a freight rate, price a lane, work out cost per mile, decide whether to accept a load, or explain why a lane is losing money. Produces the fully-loaded cost per mile, the lane economics including empty miles, the accessorial schedule, the break-even and target rate, and the accept-or-decline recommendation.
skills/freight-rate-quote/SKILL.md
Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- Yes
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Network or broad shell
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,540
- Repository last updated
- Nov 10, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- product-management Repository topic
- productivity Repository topic
- skills Repository topic
- claude-skills Repository topic
- agent-skills Repository topic
- chatgpt Repository topic
- claude-code Repository topic
- cursor Repository topic
- gemini Repository topic
- prompt-engineering Repository topic
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 6,641 bytesreferences/worked-example.mddoc · 3,777 bytes
Read excerpt
# Freight Rate Quote
Lanes lose money on the miles nobody billed for. The rate looks fine on the loaded leg, then deadhead, detention, and a reload that took two days turn a profitable quote into a loss. This builds the rate from a real cost per mile, prices the empty and waiting time honestly, and produces a number that either covers the load or tells you to decline it.
## What This Skill Produces
- **Fully-loaded cost per mile** — fixed and variable, including the costs usually left out
- **Lane economics** — loaded and empty miles, transit time, and the realistic reload position at destination
- **The accessorial schedule** — detention, layover, extra stops, and the terms that make them collectable
- **Break-even and target rate** — the floor, the target, and the margin between them
- **The accept-or-decline call** — with the reasoning, including when a below-target rate is still correct
- **The sensitivity view** — what happens to the margin if fuel, detention, or the reload assumption moves
## Required Inputs