Individual skill

home-contractor-quote-decoder

Decode a home renovation or repair quote — allowances that aren't prices, exclusions that become change orders, payment schedules that shift risk, and what a comparable-bids check should cover. Use when someone asks 'is this contractor quote fair', 'decode this renovation bid', 'what should be in a contractor contract', or 'why do these three bids differ so much'. Produces a section-by-section decode, the allowance and exclusion audit, payment-schedule risk analysis, and the questions that make bids comparable.

plugins/pm-decoders/skills/home-contractor-quote-decoder/SKILL.md

Read pinned source

Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,537
Repository last updated
Nov 8, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Home Contractor Quote Decoder Skill

The most expensive number in a renovation quote is usually one that isn't there: the allowance that runs out, the exclusion that becomes a change order, the "TBD" that becomes time-and-materials. This skill decodes the quote the way a construction manager reads a bid — hunting the gaps between what's written and what the finished job requires — and turns three incomparable bids into one comparable question set. It reads documents; it doesn't judge workmanship.

## What This Skill Produces

- A section-by-section decode: scope, materials, allowances, exclusions, schedule, payment terms
- The allowance audit — every allowance vs. what that item realistically requires, flagged where it's a teaser
- The exclusion-to-change-order map: what's not in this price that the finished job will need
- Payment-schedule risk read, and the question set that makes competing bids comparable

## Required Inputs

Ask for these only if they aren't already provided:
Back to top