Individual skill

growth-experiment-backlog

Build and prioritise a growth experiment backlog. Use when asked to plan growth experiments, prioritise growth ideas, set up a test backlog, or run a growth process/sprint. Produces a prioritised backlog — each experiment as a hypothesis with the metric it moves, an ICE/PXL score, the minimum test design, and a definition of done; plus the cadence to run it.

plugins/pm-growth/skills/growth-experiment-backlog/SKILL.md

Read pinned source

Source commit e0009a385c480fb0b5687e7412df67c7c64f7cee

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
No
Observed behavior
Not checked yet
Last checked
Nov 12, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,542
Repository last updated
Nov 11, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Growth Experiment Backlog Skill

Growth is a rate of learning, not a list of ideas. This skill turns a pile of "we should try…" into a
prioritised backlog of falsifiable experiments — each tied to a metric, scored for impact and effort,
and shaped as the smallest test that could prove it — so the team ships learning every week, not opinions.

## Required Inputs

Ask for these only if they aren't already provided:

- **The metric to move** — the one growth metric this cycle (activation, conversion, retention, referral).
- **The funnel stage / leak** — where the opportunity is (pair with [`marketing-funnel-plan`](../marketing-funnel-plan/SKILL.md)).
- **Raw ideas** — any experiment ideas already on the table.
- **Constraints** — eng/design bandwidth and traffic volume (which caps how many tests can reach significance).
Back to top