construction-rfi-response

Answer a construction request for information so the site can act on it — a direct answer, the drawing or specification reference that supports it, and an explicit statement of whether it changes cost or programme. Use when asked to respond to an RFI, answer a contractor query, or handle a request for information on site, or when RFIs keep coming back for clarification. Produces the answer with its reference, the cost and time implication stated, the instruction status, the distribution list, and the register entry.

plugins/pm-architecture/skills/construction-rfi-response/SKILL.md

Read pinned source

Source commit e0009a385c480fb0b5687e7412df67c7c64f7cee

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
No
Observed behavior
Not checked yet
Last checked
Nov 12, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,541
Repository last updated
Nov 11, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Construction RFI Response

An RFI is a clock. Site is either waiting or proceeding on an assumption, and both are expensive. The answer that works is short, points at the document that governs, and says plainly whether this is a clarification or a change — because the argument that follows is almost always about that distinction, and it is far cheaper to settle in the response than in the final account.

## What This Skill Produces

- **A direct answer** — the actual resolution, in the first line
- **The governing reference** — the drawing, specification clause, or schedule that supports it
- **Cost and programme implication** — stated explicitly, including when there is none
- **Instruction status** — whether this is a clarification of existing information or a variation requiring a formal instruction
- **The distribution list** — who else is affected and must receive it
- **The register entry** — the fields that keep the RFI log usable and the response auditable

## Required Inputs
Back to top