Individual skill

sprint-velocity-analysis

Analyze sprint velocity data and produce an engineering team health report covering delivery trends, capacity utilization, and improvement recommendations. Use when asked to analyze sprint velocity, review team delivery health, identify delivery risks, or produce a retrospective data analysis. Produces a velocity trend analysis, health diagnosis table, top improvement recommendations with implementation steps, and a next-sprint capacity forecast.

plugins/pm-engineering/skills/sprint-velocity-analysis/SKILL.md

Read pinned source

Source commit e0009a385c480fb0b5687e7412df67c7c64f7cee

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
No
Observed behavior
Not checked yet
Last checked
Nov 12, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,541
Repository last updated
Nov 11, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Sprint Velocity Analysis

Analyze sprint velocity data to produce an honest engineering team health report. The goal is not to generate optimistic-looking charts — it is to surface delivery patterns, identify dysfunction early, and give the team and their manager actionable recommendations. Look for: velocity trends (improving, declining, flat, erratic), story point calibration consistency, carry-over patterns that indicate chronic over-commitment, and capacity-related signals. Produce text-based trend visualizations, a health diagnosis, and specific improvement recommendations with measurable targets.

## Required Inputs

Ask for these if not already provided:
- **Sprint history** — for each sprint: sprint name/number, committed story points, completed story points, and number of items carried over to next sprint; ideally 6–8 sprints minimum
- **Team size and any changes** — current team size and any additions or departures during the data window
- **Known disruptions** — holidays, company all-hands, on-call incidents, or other events that affected specific sprints
- **Cycle time data (optional)** — if available, p50 and p90 cycle time per sprint (time from start to done)
- **Definition of Done** — what "completed" means for this team (merged to main? deployed to prod? accepted by PO?)

If cycle time data is not provided, omit that section and note it as a recommended data source to add.