Write a board pre-read that's sent before the meeting so the meeting is about decisions, not status. Use when asked to prepare a board pre-read, a board update/package, or pre-meeting materials for a board. Produces a board pre-read — a TL;DR, the metrics dashboard vs. plan, what's working / what's not, the decisions and asks for the board, and risks — designed to be read in advance.

plugins/pm-business/skills/board-pre-read/SKILL.md

Read pinned source

Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,539
Repository last updated
Nov 10, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Board Pre-Read Skill

The best board meetings spend zero time on status because the board already read it. A pre-read sent
48+ hours ahead does that: it conveys the state of the business and, crucially, tells the board exactly
what input and decisions are needed — so the meeting is discussion and decisions, not a slide-reading
session. This skill structures that document.

## Required Inputs

Ask for these only if they aren't already provided:

- **The headline** — the one thing the board should take away this period (good or bad).
- **Metrics vs. plan** — the key numbers against the plan/forecast (revenue, growth, burn, runway, the north-star).
- **What changed** — major wins, misses, and shifts since last meeting.