Individual skill

stakeholder-influence-mapper

Map stakeholders for a product decision and produce a tailored influence strategy with talking points. Use when asked to get alignment, build consensus, get buy-in from engineering or finance or legal, navigate organisational resistance, or plan stakeholder conversations for a major initiative. Produces a stakeholder map, recommended conversation sequence, and tailored talking points per stakeholder.

skills/stakeholder-influence-mapper/SKILL.md

Read pinned source

Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,539
Repository last updated
Nov 10, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Stakeholder Influence Mapper Skill

Turn a product initiative into a structured influence plan — who needs to be aligned, in what order, and exactly what to say to each person in their language.

## Required Inputs

Work from what is given. If any of these is missing, still produce the complete output: fill each gap with a reasonable assumption marked *(assumed, confirm)* and list those assumptions at the end. Ask a question first only when the core subject itself is missing (there is nothing to write about).
- **Initiative description** (what you want to do and why)
- **List of key stakeholders** (name, role, relationship to initiative)
- **Timeline pressure** (when do you need a decision?)
- **Any known objections or political context** (what you're already aware of)

## Process
1. Build stakeholder map with: role, primary concern, decision authority (blocker / influencer / informed), current stance (supportive / neutral / resistant / unknown)
Back to top