Individual skill

epic-progress-report

Report on an epic or initiative deeper than a status bullet — child work broken down by status, the riskiest unfinished pieces, and honest suggested cuts to hit the date. Use when asked for an epic progress report, where are we on this initiative, break down epic status, or what can we cut to ship on time. Produces the completion picture by child status, the critical-path and riskiest remaining work, a scope-cut menu with impact, and a straight call on whether the target date is realistic.

skills/epic-progress-report/SKILL.md

Read pinned source

Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,538
Repository last updated
Nov 9, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Epic Progress Report

"Epic is 60% done" is the least useful sentence in delivery — 60% of what, and is the remaining 40% the easy part or the terrifying part? This breaks the epic into its child work by status, surfaces the pieces most likely to blow the date, and — instead of just reporting — offers a cut menu and an honest read on whether the deadline survives contact with reality.

## What This Skill Produces

- **The completion picture** — child items grouped by status (done / in progress / not started / blocked), with what % and *which* work remains
- **The riskiest remaining work** — the unfinished pieces most likely to slip (unknowns, dependencies, the hard 20%)
- **The cut menu** — what could be descoped or deferred, and the impact of each cut
- **The date call** — will it make the target as-is; if not, what has to give

## Required Inputs

Ask for these if not provided:
Back to top