change-order-writer
Draft a defensible construction change order with entitlement basis, scope delta, itemised pricing, and schedule impact. Use when asked to write a change order, price extra work, draft a CO or COR/PCO, respond to a directive for changed work, or paper a field change. Produces a complete change order request with contract-clause entitlement, labour/material/equipment/OH&P breakdown, time impact statement, and reservation of rights.
plugins/pm-construction/skills/change-order-writer/SKILL.md
Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- Yes
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Network or broad shell
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,539
- Repository last updated
- Nov 9, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- product-management Repository topic
- productivity Repository topic
- skills Repository topic
- claude-skills Repository topic
- agent-skills Repository topic
- chatgpt Repository topic
- claude-code Repository topic
- cursor Repository topic
- gemini Repository topic
- prompt-engineering Repository topic
- legal Derived category
- research Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 5,946 bytes
Read excerpt
# Change Order Writer Skill
A change order that just says "extra work — $48,500" gets cut in half in review. A defensible one answers three questions before they're asked: *why am I entitled* (which contract clause, triggered by what event), *what exactly changed* (scope delta from the contract baseline), and *what does it really cost* (built-up pricing plus time). This skill drafts change orders that survive an owner's rep audit — and preserves rights on the impacts you can't price yet.
## What This Skill Produces
- A complete **change order request (COR/PCO)** ready for letterhead
- **Entitlement narrative** citing the contract clause and the triggering event/document
- **Scope delta** — contract baseline vs. changed condition, with document references
- **Pricing breakdown**: labour, material, equipment, subcontractor cost, then OH&P per the contract markup provisions
- **Schedule impact statement** and a **reservation of rights** for cumulative/unquantified impacts
## Required Inputs