Draft a defensible construction change order with entitlement basis, scope delta, itemised pricing, and schedule impact. Use when asked to write a change order, price extra work, draft a CO or COR/PCO, respond to a directive for changed work, or paper a field change. Produces a complete change order request with contract-clause entitlement, labour/material/equipment/OH&P breakdown, time impact statement, and reservation of rights.

plugins/pm-construction/skills/change-order-writer/SKILL.md

Read pinned source

Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,539
Repository last updated
Nov 9, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Change Order Writer Skill

A change order that just says "extra work — $48,500" gets cut in half in review. A defensible one answers three questions before they're asked: *why am I entitled* (which contract clause, triggered by what event), *what exactly changed* (scope delta from the contract baseline), and *what does it really cost* (built-up pricing plus time). This skill drafts change orders that survive an owner's rep audit — and preserves rights on the impacts you can't price yet.

## What This Skill Produces

- A complete **change order request (COR/PCO)** ready for letterhead
- **Entitlement narrative** citing the contract clause and the triggering event/document
- **Scope delta** — contract baseline vs. changed condition, with document references
- **Pricing breakdown**: labour, material, equipment, subcontractor cost, then OH&P per the contract markup provisions
- **Schedule impact statement** and a **reservation of rights** for cumulative/unquantified impacts