Individual skill

site-safety-briefing

Produce a toolbox talk or pre-task safety briefing from the day's planned construction work. Use when asked to write a toolbox talk, prepare a pre-task plan or JHA/JSA briefing, brief a crew on today's hazards, or plan safety for a specific task like a crane pick, excavation, or hot work. Produces a crew-ready briefing with task-specific hazards, controls ordered by the hierarchy of controls, required permits, and explicit stop-work triggers.

plugins/pm-construction/skills/site-safety-briefing/SKILL.md

Read pinned source

Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,539
Repository last updated
Nov 10, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Site Safety Briefing Skill

A toolbox talk that could apply to any site on any day protects nobody. This skill builds the briefing from **today's actual work**: what tasks are running, what they conflict with, what the weather and site conditions add, and — critically — what conditions mean the crew stops and calls the supervisor. Controls are ordered by the hierarchy of controls, because "wear your PPE" is the last line of defence, not a plan.

## What This Skill Produces

- A **crew-ready briefing** (readable aloud in 5–10 minutes) for the day's specific tasks
- A **task-hazard-control table** with controls ordered by the hierarchy of controls
- **Permit and inspection checklist** (hot work, excavation, confined space, lift plans, LOTO, etc.)
- **Simultaneous-operations (SIMOPS) conflicts** between crews working near each other
- Explicit, observable **stop-work triggers** and the emergency basics (muster point, nearest hospital, who calls)

## Required Inputs
Back to top