Individual skill

tooling-risk-assessment

Assess an injection-mold or production tooling decision before cutting steel — soft vs hard tooling tradeoff, tool life vs forecast, cavitation math, T1 sample timeline, cost of design changes after tooling, and kill criteria. Use when asked whether to kick off tooling, choose soft vs hard tools, size cavities, review a tooling quote, or assess the risk of tooling before the design is frozen. Produces a tooling risk assessment with capacity math, a decision recommendation, and explicit kill criteria.

plugins/pm-hardware/skills/tooling-risk-assessment/SKILL.md

Read pinned source

Source commit f7c90bc09ee05dc25cf257bdb1826f2c2552c2cb

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,539
Repository last updated
Nov 9, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Tooling Risk Assessment Skill

Cutting steel converts design uncertainty into cash at the worst exchange rate in hardware. This skill assesses a tooling decision the way a seasoned NPI/ME lead does: match tool class to forecast confidence, do the cavitation math against peak demand, put the T1→T2→T3 timeline on the calendar, price the "what if the design changes after tooling" scenario honestly, and write the kill criteria before the money moves.

## What This Skill Produces

- A soft vs hard tooling recommendation per part, with the tradeoff shown
- Cavitation and capacity math against the forecast ramp
- A T1 sample timeline with tuning-loop buffer
- An ECO-after-tooling cost narrative (steel-safe vs weld territory)
- Explicit kill criteria and total capital-at-risk summary

## Required Inputs
Back to top