Individual skill

pdd-build

Execute a completed PDD implementation plan step-by-step with validation gates.

skills/pdd-build/SKILL.md

Read pinned source

Source commit 073a3ee8a5dc0efd5dd32d773a760575ed38abc7

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Instructions only
Last checked
Nov 11, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
377
Repository last updated
Oct 1, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# PDD Build

## Overview

This SOP takes a completed PDD project (design doc + implementation plan) and executes the implementation plan step-by-step using subagents. Each step is built by a subagent, then verified against user-defined "done" criteria before advancing. The user defines how completion is validated — automated tests, manual testing via tmux, browser validation via Playwriter, visual inspection, or any combination.

## Parameters

- **project_dir** (required): Path to the PDD project directory (e.g., `.agents/planning/2026-02-10-review-extension`)
- **validation_strategy** (required): How the agent should verify each step is done. The user must explain this in detail.
- **start_step** (optional, default: 1): Step number to start from (for resuming interrupted builds)

**Constraints for parameter acquisition:**
- You MUST ask for all required parameters upfront in a single prompt
Back to top