Individual skill

project-flow-ops

Use when projects or tasks need explicit state, WIP control, ownership, definitions of done, blocker handling, and verified closure.

skills/project-flow-ops/SKILL.md

Read pinned source

Source commit 5a645148a108d71c76521715117b737ae60b1423

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 4, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
140
Repository last updated
Sep 19, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Project Flow Ops

<skill_contract>
  <input>Project objective, tasks, owners, dependencies, budgets, artifacts, current states, and definitions of done.</input>
  <output>A WIP-limited project state with ranked work, explicit blockers, bounded actions, and verified closure receipts.</output>
  <done>Every active item has one owner and observable artifact, and completion is backed by its named fresh verification.</done>
  <non_goals>Hidden WIP, duplicate ownership, status by intuition, backlog accumulation, or completion without evidence.</non_goals>

Maintain a small, inspectable project state machine: `BACKLOG -> ACTIVE -> BLOCKED | COMPLETED`. Optimize flow and verified outcomes, not task volume.

## Usage Template

Provide: project objective, current tasks, owners, dependencies, time budget, artifacts, and definition of done. Optional: prior review receipts.