Individual skill
navan-prod-checklist
Audit whether a Navan integration is ready for production using evidence and rollback criteria. Use when preparing to enable a live API, transfer, identity, or finance workflow. Trigger with "ship Navan integration", "Navan go-live", or "Navan production checklist".
skills/.curated/navan-prod-checklist/SKILL.md
Source commit 0500b275e963c027f6b410e8c49c0446945c574e
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Not checked yet
- Last checked
- Nov 12, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 2,917
- Repository last updated
- Nov 12, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- ai Repository topic
- automation Repository topic
- claude-code Repository topic
- devops Repository topic
- mcp Repository topic
- ai-agents Repository topic
- anthropic Repository topic
- claude-code-plugins Repository topic
- developer-tools Repository topic
- llm Repository topic
- saas Declared skill tag
- navan Declared skill tag
- production Declared skill tag
- finance Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 3,673 bytesreferences/official-docs.mddoc · 1,141 bytes
Read excerpt
# Navan Production Readiness Gate
## Overview
Audit whether a Navan integration is ready for production using evidence and rollback criteria. This workflow produces an auditable decision or artifact before any live action.
## Prerequisites
- Access to the selected tenant's current Navan Help Center and contracted integration documentation.
- A named business owner and data owner for the travel or expense workflow.
- A non-production evidence set with secrets and traveler data removed.
## Current Contract
Production readiness binds one documented tenant contract to one identity, destination, data purpose, operating window, and rollback plan. A successful sandbox or fixture test is necessary but not sufficient.