Individual skill

deepgram-prod-checklist

Execute Deepgram production deployment checklist. Use when preparing for production launch, auditing production readiness, or verifying deployment configurations. Trigger: "deepgram production", "deploy deepgram", "deepgram prod checklist", "deepgram go-live", "production ready deepgram".

skills/.curated/deepgram-prod-checklist/SKILL.md

Read pinned source

Source commit 0500b275e963c027f6b410e8c49c0446945c574e

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
No
Observed behavior
Not checked yet
Last checked
Nov 12, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
2,916
Repository last updated
Nov 12, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt
# Deepgram Production Checklist

## Prerequisites

- A named service/data owner, approved model/provider/data-routing decision, and production rollback plan.
- Passing staging evidence for credentials, audio retention/consent, observability, rate limits, quality, and incident escalation.

## Examples

Run the final production gate with a non-sensitive canary, verify alert routing and the redacted request receipt, then observe against the stated quality/latency/error threshold. If any gate fails, halt rollout and restore the previous approved configuration rather than extending the canary or disabling controls.

## Overview

Comprehensive go-live checklist for Deepgram integrations. Covers singleton client, health checks, Prometheus metrics, alert rules, error handling, and a phased go-live timeline.
Back to top