Individual skill

palantir-prod-checklist

Run a fail-closed production-readiness review for a Foundry pipeline, OSDK application, DevOps product, or Compute Module. Use when preparing a first release or high-risk promotion. Trigger with "Palantir production checklist".

skills/.curated/palantir-prod-checklist/SKILL.md

Read pinned source

Source commit 0500b275e963c027f6b410e8c49c0446945c574e

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
No
Observed behavior
Not checked yet
Last checked
Nov 12, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
2,917
Repository last updated
Nov 12, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt
# Palantir Production Readiness Gate

## Overview

Prove the exact artifact, data contract, access model, observability, failure path, and rollback before promotion. A collection of green local tests is insufficient without Foundry checks and target-environment evidence.

## Prerequisites

- Identify the accountable product, application, data, security, and operations owners.
- Freeze the candidate commit, generated OSDK/package, product version, or container digest.
- Read `references/official-docs.md` and collect non-production receipts for every required gate.
- Name the release window, maintenance constraints, rollback target, and recovery objective.

## Current Contract
Back to top