Individual skill

ramp-rate-limits

Implement a shared Ramp request budget with rolling-window throttling, bounded retries, pagination, and 504 recovery. Use when clients receive 429 or 504 responses or share one outbound IP. Trigger with "Ramp rate limit" or "Ramp 429".

plugins/saas-packs/ramp-pack/skills/ramp-rate-limits/SKILL.md

Read pinned source

Source commit 0500b275e963c027f6b410e8c49c0446945c574e

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
No
Observed behavior
Not checked yet
Last checked
Nov 12, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
2,917
Repository last updated
Nov 12, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt
# Ramp Rate-Limit and Timeout Control

## Overview

Coordinate all workers that share an egress IP, because independent per-process retries can amplify a rolling-window breach. Preserve idempotency and reconcile ambiguous writes before retry.

## Prerequisites

- Identify the Ramp application, environment, business entities, affected data and workflows, accountable owner, and rollback boundary.
- Read `references/official-docs.md` and re-check endpoint schemas, scopes, limits, and support status before a live operation.
- Use synthetic fixtures or Ramp sandbox until production access and business effects are explicitly approved.
- Prepare approved secret storage and a sanitized evidence location.

## Current Contract
Back to top