Individual skill

granola-prod-checklist

Production readiness checklist for Granola team and enterprise deployment. Use when rolling out Granola to a team, planning enterprise deployment, or verifying all configuration is production-ready. Trigger: "granola production", "granola rollout", "granola deployment", "granola checklist", "granola go-live".

skills/.curated/granola-prod-checklist/SKILL.md

Read pinned source

Source commit 0500b275e963c027f6b410e8c49c0446945c574e

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
No
Observed behavior
Not checked yet
Last checked
Nov 12, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
2,916
Repository last updated
Nov 12, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt
# Granola Production Checklist

## Overview

Comprehensive pre-launch checklist for deploying Granola to a team or organization. Covers plan selection, security hardening, integration setup, pilot program, and go-live execution.

## Prerequisites

- Budget approved for Granola licenses
- Team size and meeting volume estimated
- IT/security review completed or in progress
- Admin access to Granola workspace

## Instructions
Back to top