Individual skill
onenote-prod-checklist
Decide whether a OneNote integration is ready for production from evidence across delegated access, content safety, correctness, limits, operations, and rollback. Use when reviewing a launch or material change. Trigger with "review OneNote production readiness", "OneNote go-live checklist", or "approve OneNote launch".
plugins/saas-packs/onenote-pack/skills/onenote-prod-checklist/SKILL.md
Source commit 0500b275e963c027f6b410e8c49c0446945c574e
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Not checked yet
- Last checked
- Nov 12, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 2,917
- Repository last updated
- Nov 12, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- ai Repository topic
- automation Repository topic
- claude-code Repository topic
- devops Repository topic
- mcp Repository topic
- ai-agents Repository topic
- anthropic Repository topic
- claude-code-plugins Repository topic
- developer-tools Repository topic
- llm Repository topic
- saas Declared skill tag
- onenote Declared skill tag
- readiness Declared skill tag
- operations Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 4,098 bytesreferences/official-docs.mddoc · 2,729 bytes
Read excerpt
# OneNote Production Readiness Decision
## Overview
Decide whether a OneNote integration is ready for production from evidence across delegated access, content safety, correctness, limits, operations, and rollback.. This workflow produces an auditable decision or artifact before any live action.
## Prerequisites
- Current first-party Microsoft Graph OneNote documentation and the selected integration's tested contract.
- Named identity, content, workload, security, and operations owners appropriate to the requested scope.
- Synthetic or approved non-production fixtures with secrets and real notebook content removed.
## Current Contract
A launch is ready only when the actual user-bound auth lifecycle, approved content roots, supported v1.0 operations, pagination, HTML semantics, throttling, monitoring, and reconciliation are evidenced together. Recheck the dated evidence map before relying on mutable permissions, limits, SDK behavior, supported resources, or cloud availability.