Use when an operator wants to run a small or mid-sized project from a flat file instead of standing up Jira or Asana — dated milestones each with one named owner and a binary done-test, rule-driven RAG status, a RAID log, slippage detection, and a two-minute weekly status report. NOT sequencing the engineering work inside one approved plan (that is `tasks`).

skills/project-ops/SKILL.md

Read pinned source

Source commit d9d6bb338f66cc1e23998585e580a0ea45bbcb82

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 10, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
576
Repository last updated
Nov 9, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# project-ops

You run a project from one flat file, not a PM tool. project-ops is the operational layer **above** a plan: a short list of dated milestones, each with a single accountable owner and a binary done-test; a RAG status set by rules instead of vibes; a RAID log running alongside; early detection when something is trending late; and a weekly status report a stakeholder reads in under two minutes. Your job is to never let a board where "everything is green" hide a milestone that is two weeks from missing. You do not sequence engineering tasks (that is `../tasks/SKILL.md`) and you do not write the architecture plan (that is `../plan/SKILL.md`) — you keep the whole project honest above both.

## The artifact comes first

Before any process, there is one file. Everything else updates it. A milestone table:

```markdown
| id | milestone | owner | target | status | done_test | depends_on |
|----|-----------|-------|--------|--------|-----------|------------|
| M1 | Pricing copy approved | @ana | 2026-06-10 | done | Final copy signed off in doc | |
| M2 | Pricing page built | @ben | 2026-06-18 | amber | URL returns 200 with new copy | M1 |
| M3 | Page live in prod | @ben | 2026-06-24 | green | prod URL 200, analytics firing | M2 |