Individual skill

mlsys-camera-ready

Use when preparing an accepted MLSys paper for publication on proceedings.mlsys.org, covering de-anonymization of the research-track PDF, restoring company and repository identity, reconciling promised rebuttal edits, the reserved-ticket registration window for authors, and sequencing camera-ready work against the artifact-evaluation deadline.

MLSys-Skills/skills/mlsys-camera-ready/SKILL.md

Read pinned source

Source commit 932eb23331721b16e967c59f093781be1928b498

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
No
Observed behavior
Not checked yet
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,409
Repository last updated
Sep 27, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# MLSys Camera Ready

Use this after an MLSys acceptance. Two things make this venue's post-acceptance phase
unusual: proceedings are published on the conference's own open archive
(proceedings.mlsys.org, no publisher paywall and no APC), and the artifact-evaluation
deadline lands in the same post-notification stretch — in 2026, notifications came
January 25-26 and AE submissions were due March 8, so camera-ready and artifact packaging
compete for the same weeks. Plan them as one project.

## Post-acceptance timeline (2026-cycle anchors)

| Milestone | 2026 anchor | Owner risk |
|---|---|---|
| Notification | January 25-26, 2026 | — |
Back to top