Individual skill

popl-camera-ready

Use when a POPL paper is conditionally accepted — planning the mandatory revision the Review Committee must approve, de-anonymizing for PACMPL Issue POPL, handling ORCID/open-access/APC steps on the ACM side, syncing the paper with its proof artifact, and preparing the January talk.

POPL-Skills/skills/popl-camera-ready/SKILL.md

Read pinned source

Source commit 932eb23331721b16e967c59f093781be1928b498

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,400
Repository last updated
Sep 27, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# POPL Camera-Ready and Conditional-Acceptance Revision

POPL does not accept papers; it *conditionally* accepts them. Per the POPL 2027 call
(read 2026-07-08), authors "must submit a satisfactory revision to the Review
Committee by the requested deadline or risk rejection." The camera-ready is therefore
two gates, not one: first satisfy the committee's revision requirements, then produce
the PACMPL Issue POPL journal article. The 2027 revision deadline was not rendered at
check time — 待核实; take it from your notification email, which controls.

## Gate 1: the committee revision

- Extract every mandatory item from the meta-review and reviews into a ledger; the
  committee re-checks against its own list, not your memory.
- Anything promised in the author response is now owed. A response that said "we will
Back to top