Individual skill
micro-camera-ready
Use when a MICRO paper is accepted and the camera-ready is due — the nine-week July-to-September window in the 2026 cycle, de-anonymization and acknowledgments restoration, keeping the all-author reference rule, integrating rebuttal promises, the optional post-AE artifact appendix, and IEEE/ACM publication logistics.
MICRO-Skills/skills/micro-camera-ready/SKILL.md
Source commit 932eb23331721b16e967c59f093781be1928b498
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- Yes
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Network or broad shell
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,404
- Repository last updated
- Sep 27, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- academic-writing Repository topic
- agent-skills Repository topic
- journal Repository topic
- academic-research Repository topic
- ai-agents Repository topic
- anthropic Repository topic
- awesome-list Repository topic
- claude Repository topic
- claude-code Repository topic
- economics Repository topic
- operations Derived category
- research Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Read excerpt
# MICRO Camera-Ready
For the 2026 cycle: notification July 7, camera-ready **September 11, 2026** — nine
weeks, with artifact evaluation (see `micro-artifact-evaluation`) running inside
the same span and the symposium following in Athens, Oct 31 – Nov 4. This skill
turns the acceptance email into a correct published record.
## The nine-week plan
| Weeks | Work |
|---|---|
| 1 | Re-read reviews cold; extract every fix promised in the rebuttal into a tracked worklist |
| 2–4 | Execute the worklist: new runs promised, clarified methodology text, corrected figures |
| 3–6 | Artifact evaluation submission and evaluator support (parallel track) |