Individual skill

sigmod-workflow

Use when planning a SIGMOD project calendar under the PACMMOD round system, covering round selection and hopping, backward planning from abstract and paper cutoffs, the feedback and revision windows, embargo-aware contingencies, and coordinating a systems-building team against quarterly deadlines.

SIGMOD-Skills/skills/sigmod-workflow/SKILL.md

Read pinned source

Source commit 932eb23331721b16e967c59f093781be1928b498

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,413
Repository last updated
Sep 27, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# SIGMOD Workflow

SIGMOD project management differs from single-deadline conferences in kind:
with four research rounds a year feeding PACMMOD issues, the strategic
variable is *which* round, and the punishment structure (a 12-month embargo
on rejection, one month to execute a revision) rewards teams that plan the
whole round, not just the deadline. Anchor every date below to the live
important-dates page before acting; the quarterly pattern is durable, the
dates are not.

## The round as a five-act unit

```text
Act 1  Abstract + COIs        (deadline minus ~1 week)
Back to top