Individual skill

imfer-rebuttal

Use when an IMF Economic Review (IMFER) R&R or decision letter arrived and you need a response-letter strategy for a dual academic/policy referee panel. Plans and drafts the response; it returns to imfer-submission for the resubmission preflight and does not re-run the original identification (imfer-identification).

IMF-Economic-Review-Skills/skills/imfer-rebuttal/SKILL.md

Read pinned source

Source commit 932eb23331721b16e967c59f093781be1928b498

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,411
Repository last updated
Sep 27, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Rebuttal Strategy (imfer-rebuttal)

## When to trigger

- An IMFER R&R (major or minor) arrived and you must turn referee reports into a revision plan
- The editor's letter prioritizes some points over others and you must read the signal
- A referee asks for a new identification check, a country-composition test, or a stronger policy framing
- Two referees disagree — one academic-leaning, one policy-leaning — and you must satisfy both
- You need to decide what to concede, what to push back on, and what to defer
- A referee requests a major redesign and you must decide whether to comply, push back, or withdraw

## How to read an IMFER decision letter

IMFER R&Rs usually carry the **dual signature** of the pool: an academic referee pressing on identification and frontier novelty, and a reader pressing on **policy relevance and program realism**. Start from the **editor's letter** — it ranks the points and signals which are deal-breakers. The classic IMFER revision arc is: shore up the cross-country design, add the composition/common-shock checks the referees expect, and **sharpen (or appropriately bound) the policy implication** without overreaching. Treat the academic and policy concerns as two tracks that must both be closed.
Back to top