Individual skill

iccv-camera-ready

Use when an ICCV paper is accepted and the final version, releases, and October conference must be delivered, covering de-anonymization edits, the summer camera-ready window between June decisions and the autumn meeting, CVF open access plus IEEE Xplore publication, arXiv synchronization after the embargo lifts, and presenting at an international venue.

ICCV-Skills/skills/iccv-camera-ready/SKILL.md

Read pinned source

Source commit 932eb23331721b16e967c59f093781be1928b498

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,405
Repository last updated
Sep 27, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# ICCV Camera-Ready

Acceptance at ICCV opens an unusually long runway: decisions landed in late June
2025 and the conference ran October 19–23 in Honolulu, leaving roughly four months
between verdict and podium. The camera-ready deadline sits inside that window
(the exact 2025 date was not fetchable at verification time — 待核实; it is
communicated in the acceptance email and on the conference site). Use the runway
deliberately: most camera-ready damage happens in the first rushed week, and most
release-promise damage in the last.

## The publication pair

An ICCV paper is published through two channels with different jobs:
Back to top