Individual skill
iccv-supplementary
Use when planning or auditing ICCV supplementary material under the same-day paper-plus-supplement deadline, covering what moves out of the 8-page body, parallel production of videos and code from February onward, double-blind hygiene inside the archive, and making depth material navigable for reviewers who choose to open it.
ICCV-Skills/skills/iccv-supplementary/SKILL.md
Source commit 932eb23331721b16e967c59f093781be1928b498
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Not checked yet
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,411
- Repository last updated
- Sep 27, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- academic-writing Repository topic
- agent-skills Repository topic
- journal Repository topic
- academic-research Repository topic
- ai-agents Repository topic
- anthropic Repository topic
- awesome-list Repository topic
- claude Repository topic
- claude-code Repository topic
- economics Repository topic
- research Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Read excerpt
# ICCV Supplementary Material
Since the 2025 cycle, ICCV collects the supplement **at the paper deadline** —
one upload event in early March (March 7, 2025, 11:59pm HST; announced as a
deliberate process change that also shortened the decision timeline). That
single scheduling fact rewrites supplement strategy: there is no packaging week
after the paper freezes, so the supplement is a parallel product with its own
owner from February, or it is a casualty.
## What the same-day rule changes in practice
| Old two-deadline habit | Same-day reality |
|---|---|
| "Ship the paper, then render videos next week" | Videos render while the paper is still being edited — reserve machines for both |