Individual skill

mobicom-workflow

Use when planning a MobiCom campaign across the rolling two-deadlines-per-year calendar — deciding which round to target and which edition it feeds, building a backward schedule that leaves room for over-the-air experiments, and sequencing the two-round review, rebuttal, and one-shot revision so a slip does not silently cost an edition.

MobiCom-Skills/skills/mobicom-workflow/SKILL.md

Read pinned source

Source commit 932eb23331721b16e967c59f093781be1928b498

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,402
Repository last updated
Sep 27, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# MobiCom Workflow

MobiCom's calendar is the part authors from single-deadline venues mis-plan most. There are
**two rounds a year**, each feeds a **different edition**, and inside each round the review
runs in **two stages with a rebuttal**. Plan the campaign around those facts, not around a
single "the deadline."

## Which round, which edition

Before scheduling anything, pin two facts on the live CFP / HotCRP `/deadlines` page:

- **Which edition does this round feed?** The summer/fall round opening after MobiCom 2026
  competes for **MobiCom 2027**. Submitting to it is a bet on next year's program, not this
  year's.
Back to top