Individual skill

siggraph-camera-ready

Use when preparing the final version of a conditionally accepted SIGGRAPH / SIGGRAPH Asia Technical Paper for publication in ACM Transactions on Graphics, covering the second-stage committee verification, TOG journal metadata and DOI, ACM rights and CCS concepts, final results video and representative image, and permanent code/data links.

SIGGRAPH-Skills/skills/siggraph-camera-ready/SKILL.md

Read pinned source

Source commit 932eb23331721b16e967c59f093781be1928b498

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,405
Repository last updated
Sep 27, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# SIGGRAPH Camera-Ready

A SIGGRAPH accept is a **conditional** accept: your paper is not done until a Technical Papers
Committee member has verified the final version in the **second reviewing process**. The output is
an **ACM Transactions on Graphics (TOG)** journal article (e.g., SIGGRAPH 2026 = TOG Vol. 45,
Issue 4), so the camera-ready is a journal production task, not a proceedings cleanup. Facts below
trace to `resources/official-source-map.md`; reconfirm the current TOG production checklist and
deadlines.

## Clear the conditions first

Conditional acceptance came with required changes. Before any production polish:

- Turn every condition from the decision and reviews into a concrete edit, and keep a change map
Back to top