Individual skill
sosp-camera-ready
Use when preparing a SOSP camera-ready after acceptance, working with an assigned shepherd toward the final deadline, expanding from the 12-page submission to the 13-page final limit (14 with shepherd approval), de-anonymizing safely, adding artifact badges, and meeting ACM proceedings requirements.
SOSP-Skills/skills/sosp-camera-ready/SKILL.md
Source commit 932eb23331721b16e967c59f093781be1928b498
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Not checked yet
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,410
- Repository last updated
- Sep 27, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- academic-writing Repository topic
- agent-skills Repository topic
- journal Repository topic
- academic-research Repository topic
- ai-agents Repository topic
- anthropic Repository topic
- awesome-list Repository topic
- claude Repository topic
- claude-code Repository topic
- economics Repository topic
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Read excerpt
# SOSP Camera-Ready
Use this between a SOSP acceptance notification and the final-version deadline. The
2026-cycle anchors (verified 2026-07-08 on the sosp26 HotCRP deadlines page and the
official author guidelines): notification July 3, 2026; camera-ready due August 28,
2026; final papers may use **13 pages of technical content**, and the shepherd may
approve **one additional page** for a 14-page maximum. References remain uncounted.
Proceedings are published in the ACM Digital Library.
## Shepherding is the center of this phase
Accepted SOSP papers are shepherded: a PC member is assigned to see the revision
through, and the shepherd's sign-off — including on the optional 14th page — gates the
camera-ready. Treat the shepherd as the PC's delegate, not as a copy editor.