Individual skill

iros-workflow

Use when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.

IROS-Skills/skills/iros-workflow/SKILL.md

Read pinned source

Source commit 932eb23331721b16e967c59f093781be1928b498

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,411
Repository last updated
Sep 27, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# IROS Workflow

Use this as the project-management skill for an IROS submission. Replace every date with the current
official timetable and work backward from PaperPlaza cutoffs.

IROS is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge.
It is **co-sponsored by IEEE RAS and the Robotics Society of Japan (RSJ)** — hence "IEEE/RSJ" — and the
organizing committee rotates yearly between regions, so re-check the current CFP and committee page
rather than carrying names or rules forward. The cost model is registration plus any per-page charge,
and proceedings go to IEEE Xplore.

## The fall-venue rhythm (2026 shape)

IROS is the **fall** IEEE-RAS mega-venue, the seasonal counterpart to ICRA's spring cycle. The 2026
Back to top