Individual skill
micro-workflow
Use when planning a MICRO campaign end to end — the April-to-Athens 2026 cycle clock, the four-venue architecture calendar (MICRO/ISCA/HPCA/ASPLOS) seen from MICRO's October seat, resubmission lattices after each outcome, and starting the MICRO 2027 evaluation stack early enough to matter.
MICRO-Skills/skills/micro-workflow/SKILL.md
Source commit 932eb23331721b16e967c59f093781be1928b498
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- Yes
- Repository scan complete
- No
- Skill scan complete
- Yes
- Observed behavior
- Network or broad shell
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,404
- Repository last updated
- Sep 27, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- academic-writing Repository topic
- agent-skills Repository topic
- journal Repository topic
- academic-research Repository topic
- ai-agents Repository topic
- anthropic Repository topic
- awesome-list Repository topic
- claude Repository topic
- claude-code Repository topic
- economics Repository topic
- engineering Derived category
- marketing Derived category
- operations Derived category
- productivity Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 6,976 bytes
Read excerpt
# MICRO Workflow
MICRO owns the **autumn slot** of computer architecture's four-venue year: an early
April deadline feeding an end-of-October symposium. Because the four sibling venues
interleave, a MICRO plan is really a lattice plan — every outcome has a next move
within roughly four months. Dates below verified 2026-07-08; every one is a
single-cycle snapshot.
## The 2026 cycle clock (59th edition, Athens)
```text
2026-03-31 abstract registration 11:59 PM EDT hard gate
2026-04-07 full paper 11:59 PM EDT micro2026.hotcrp.com
2026-06-03 → 06-17 rebuttal/revision two-week window (micro-author-response)