Individual skill

icassp-workflow

Use when planning an ICASSP project timeline — the annual clock from venue fit through the September paper deadline, single-blind review, the short winter rebuttal, spring notification, IEEE Xplore camera-ready, and the May conference — with backward-planning offsets and the choice among standard, OJSP-ICASSP, and grand-challenge tracks.

ICASSP-Skills/skills/icassp-workflow/SKILL.md

Read pinned source

Source commit 932eb23331721b16e967c59f093781be1928b498

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,405
Repository last updated
Sep 27, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# ICASSP Workflow

Use this as the project-management skill for an ICASSP submission. Replace every date with the
current official timetable and work backward from the paper deadline. ICASSP is an **IEEE
Signal Processing Society conference**, rebuilt by a new local committee each year; it has no
standing editor-in-chief, and the cost model is registration, with the proceedings paper
published in IEEE Xplore.

## The annual clock (2026-cycle shape, verify each year)

- **September** — full-paper deadline on the CMS portal (ICASSP 2026: 17 Sep 2025; **ICASSP 2027
  reported ~16 Sep 2026, the next major gate as of 2026-07-09**).
- **Autumn/early winter** — single-blind technical-committee review.
- **December** — short rebuttal/author-response window (2026 cycle: reported to ~22 Dec 2025), if
Back to top