Individual skill
unit-commitment-operating-rules
Use for day-ahead or multi-period unit commitment problems, including thermal on/off schedules, dispatch, startup/shutdown logic, minimum up/down time, ramping, spinning reserve deliverability, renewable curtailment, operating-cost accounting, and independent feasibility checks for power-system operations schedules.
tasks/energy-unit-commitment/environment/skills/unit-commitment-operating-rules/SKILL.md
Source commit f860ecf02ef53412a030f8661c83d644b739ff01
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- Yes
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Network or broad shell
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,910
- Repository last updated
- Nov 4, 2026
- License
- Apache-2.0
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- benchmark Repository topic
- skillsbench Repository topic
- finance Derived category
- operations Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Browse files
SKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytesSKILL.mdcore · 8,199 bytes
Read excerpt
# Unit Commitment Operating Rules
Use this skill when a task asks for a day-ahead or multi-period unit commitment schedule with generators, load, reserves, operating constraints, and cost tradeoffs.
This is a reusable UC operating guide. It gives formulation and validation patterns, not a complete task-specific mathematical model.
## UC In One Paragraph
Unit commitment decides which generators are online over time, when they start or stop, how much they produce, and how much reserve they can physically provide. It is harder than hourly economic dispatch because startup/shutdown decisions, ramping, minimum up/down time, reserve deliverability, initial conditions, and cost curves couple one period to the next.
## Keep These Concepts Separate
For each thermal unit `g` and period `t`: