Individual skill

unit-commitment-data-modeling

Use for parsing structured unit commitment input data from JSON, CSV, benchmark cases, spreadsheets, databases, or nested tables; finding fields for time periods, resources, load, reserve, generator limits, initial conditions, startup data, renewable availability, and production costs without assuming one source-specific schema.

tasks/energy-unit-commitment/environment/skills/unit-commitment-data-modeling/SKILL.md

Read pinned source

Source commit f860ecf02ef53412a030f8661c83d644b739ff01

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 9, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
1,910
Repository last updated
Nov 4, 2026
License
Apache-2.0

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Unit Commitment Structured Data Parsing

Use this skill when a unit commitment task provides structured data and you need to map fields into UC concepts. The source may be JSON, CSV, spreadsheets, database tables, or nested dictionaries. The prompt and schema are the source of truth; do not assume one benchmark or package.

## Parsing Workflow

1. Load data with structured parsers: JSON as objects, CSV/sheets as tables, databases as query results.
2. Inspect schema: top-level keys, tables/sheets, resource groups, time-series fields, cost curves, startup tiers, and initial-condition fields.
3. Identify the time axis: number of periods, labels, duration, and report convention.
4. Identify resource sets: thermal, renewable, storage, imports, zones, reserve products, or network objects.
5. Normalize fields into arrays/tables with explicit shapes.
6. Preserve original names and source ordering for final reports.
7. Run parser-level checks before modeling.
Back to top