Individual skill
Diligence Architecture
Build a structured due diligence workplan with workstream owners, DDQ templates, key risk checklist, and a risk-ranked issues log ready for the IC memo.
packs/private-equity/skills/diligence-architecture/SKILL.md
Source commit e19bba60ec18203161854532f283a19023c20d3d
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- No
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Not checked yet
- Last checked
- Nov 11, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
Standard SKILL.md format has not been attested at this commit. No installation command is available; inspect the source.
Repository context
- Repository stars (not skill ratings)
- 25
- Repository last updated
- Sep 10, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- agent-skills Repository topic
- anthropic Repository topic
- claude Repository topic
- claude-code Repository topic
- claude-skills Repository topic
- dcf Repository topic
- finance Repository topic
- investment-banking Repository topic
- lbo Repository topic
- private-equity Repository topic
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Read excerpt
# Diligence Architecture
## When to use
Use this skill after completing the CIM teardown and before the first management meeting. The output is the workplan that coordinates your deal team (internal associates, external advisors, specialist consultants) across all diligence workstreams. It ensures nothing material falls through the gaps and that every risk identified in the teardown is owned by a specific workstream with a specific deliverable.
## What it does
Produces: (1) a structured diligence workplan with workstreams, owners, and key deliverables; (2) a due diligence questionnaire (DDQ) tailored to the specific business model and thesis; (3) a key-man and management risk checklist; and (4) a risk-ranked issues log template that tracks findings from first management meeting through final IC memo.
## Method
### Step 1 -- Define workstreams