Individual skill

Hundred-Day Plan

Produces the first hundred days as a bandwidth-budgeted, sequenced plan with the reporting cadence installed in week one and an explicit cut list, when you need a plan management can execute rather than a wish list.

packs/private-equity/skills/hundred-day-plan/SKILL.md

Read pinned source

Source commit e19bba60ec18203161854532f283a19023c20d3d

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 11, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

Standard SKILL.md format has not been attested at this commit. No installation command is available; inspect the source.

Repository context

Repository stars (not skill ratings)
25
Repository last updated
Sep 10, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Hundred-Day Plan

## When to use

Use this skill between signing and completion, when the team converts the investment thesis into what actually happens after the wire clears. It applies equally to a carve-out carrying TSA obligations and to a bolt-on where the hundred days belong to integration. Reach for it when the draft already runs to thirty actions -- the failure mode it exists to fix.

## What it does

Produces a plan in four parts: a bandwidth budget in executive-days, three to five moves priced against it, a dependency-ordered sequence with the week-one reporting cadence, and a published list of what is deliberately not being done.

## Method

1. **Budget the bandwidth before choosing the moves.** Count the executive-days genuinely available: executives who can carry change work, times fourteen weeks, times the share of their week not spent running the business -- usually one day in five. A plan costing more than that budget is a wish list, and saying so now is cheaper than finding out at day sixty.
2. **Choose three to five moves.** Each must protect value acquired, unlock a named lever in the EBITDA bridge, or buy information diligence could not. Anything failing all three waits for the year-one budget. Price each in executive-days and hold back about 20%, because something unforecast always arrives in month one.
Back to top