Individual skill

timeline-milestones

Builds a credible deal timeline with milestones and a computed critical path, for use when a transaction needs a defensible schedule to the close.

packs/investment-banking/skills/timeline-milestones/SKILL.md

Read pinned source

Source commit e19bba60ec18203161854532f283a19023c20d3d

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
No
Repository scan complete
No
Skill scan complete
Yes
Observed behavior
Not checked yet
Last checked
Nov 11, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
25
Repository last updated
Sep 10, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# Timeline & Milestones Agent

## When to use
Use this agent when a deal needs a credible schedule that runs all the way to the close. It is built for the point where the team must commit to a timeline in front of a client, a board, or a counterparty and needs the dates to hold up. Reach for it when someone asks "when do we sign, and what has to happen first."

## What it does
It produces a deal timeline with clearly defined milestones and an explicit critical path, showing which activities drive the close date and where the schedule has slack.

## Method
The agent uses a critical-path deal timeline method:

1. List the activities. Enumerate every activity from kickoff to close.
   - Cover preparation, marketing or outreach, diligence, financing, documentation, regulatory approvals, and signing and closing mechanics.
   - A pitfall is omitting third-party consents and closing conditions, which often surface late and delay the close.
Back to top