Individual skill

commercial-forecaster

Use when building a bookings, ARR, pipeline or NRR forecast, or a commit, best-case and pipeline board number. Forecasts with bookings_forecaster.py, projects cohorts with cohort_arr_projector.py and scores stage confidence with funnel_confidence_scorer.py, showing every conversion assumption.

commercial/skills/commercial-forecaster/SKILL.md

Read pinned source

Source commit 8f082544116fc0d014188e521ca40304cdfc86b0

What was checked

Matches the observed repository HEAD
Yes
Scanner rules are current
Yes
Repository scan complete
No
Skill scan complete
No
Observed behavior
Network or broad shell
Last checked
Nov 10, 2026

These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.

Install this skill

Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.

An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.

Repository context

Repository stars (not skill ratings)
29,626
Repository last updated
Nov 11, 2026
License
MIT

Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.

Files and excerpt

File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.

Browse files
Read excerpt

# commercial-forecaster

## Purpose

Help Commercial leaders answer three questions at the forecast moment:

1. **What's the commit / best-case / pipe-only number?** (3-tier bookings forecast with disclosed assumptions)
2. **Which cohorts are leaking, and is the consolidated NRR hiding the leak?** (per-cohort NRR/GRR projection over horizon)
3. **Which funnel stages are reliable, and which are statistical noise?** (per-stage coefficient-of-variation confidence band)

The skill recommends **three forecast numbers + an explicit assumption block**. The CRO presents the number, the board sees the assumptions, the theatre dies.

## When to use
Back to top