Individual skill
finishing-work
Final completion discipline including summary generation, plan document updates, and confirmation that all success criteria from the original plan are satisfied.
library/methodologies/rpikit/skills/finishing-work/SKILL.md
Source commit feb68abe397acc14f32b34984975c48fedba2b33
What was checked
- Matches the observed repository HEAD
- Yes
- Scanner rules are current
- Yes
- Repository scan complete
- No
- Skill scan complete
- No
- Observed behavior
- Network or broad shell
- Last checked
- Nov 9, 2026
These are observations at the recorded commit, not a guarantee of safety. Review the source before running it.
Install this skill
Choose an agent in your Stack or copy a command below. Commands fetch the pinned commit and copy only this skill directory. Existing destinations are refused. Copying a command does not install anything.
An install command is unavailable: current rules, complete repository and skill scans, an eligible behavior level and a permitted license are required.
Repository context
- Repository stars (not skill ratings)
- 1,904
- Repository last updated
- Nov 1, 2026
- License
- MIT
Observed agent integration: No specific integration evidence. Standard SKILL.md installation does not imply verified compatibility.
- agent-orchestration Repository topic
- agent-skills Repository topic
- agentic-ai Repository topic
- agentic-workflow Repository topic
- ai-automation Repository topic
- babysitter Repository topic
- claude-code Repository topic
- claude-skills Repository topic
- trustworthy-ai Repository topic
- vibe-coding Repository topic
- engineering Derived category
Files and excerpt
File metadata and permitted, redacted excerpts come from the recorded scan. Source links are pinned to that commit.
Read excerpt
- When transitioning from implementation to done
- Final quality check before closing out work
## Process
1. Verify all plan steps marked complete
2. Confirm all success criteria met
3. Update plan document with final status
4. Generate completion summary (steps, phases, files, tests, reviews)
5. Confirm with user that work is complete
## Summary Format
- Steps completed: N/M